Power Minister to deliberate with CM’s of AP and Assam on Subansiri.

NHPC protest

Guwahati/25th April’2017 (Prag News): Spree of sound infrastructural development paves the path with Power Minister at the Union, Piyush Goyal took a comprehensive review of issues of the Subansiri Project. The must needed signs of “approval” to the Centre was recently being exchanged from Assam and Arunachal Pradesh states CMs’ to jet-start 2000 M/W Lower Subansiri  Hydroelectricity project at Geruamukh along the Assam-Arunachal boundary.

This project was one of the most ambitious projects here in North East that was shelved post the anti-dam protests back in 2011.  CM Pema Khandu stated that the hydro-electricity project is a long-gone stalled and the meeting with Assam CM Sarbananda Sonowal will provide the much needed steer to the project.
And it is not unlikely to bring in the urge of fast-tracking the Khuppi-Bomdila-Tawang 132 KV transmission line and Bomdila-Kalaktang 132 KV transmission line.

Share it on

Leave a Reply