--°C
Loading...
Listen to Article
2 min read
80%
On Friday, the NEEPCO opened six gates of the Khandong Dam at Umrangso in Assam's Dima Hasao...

Digital Desk: North Eastern Electric Power Corporation Limited (NEEPCO) opened up to six gates of the Khandong Dam at Umrangso in Assam's Dima Hasao.

According to sources, the decision to release the dam gates was made when the water levels in the Khargol and Kopili rivers exceeded the dam's capacity.

This comes amid torrential rains in Assam and the Northeast. Last year, an accident at NEEPCO's 75 Megawatt project halted all operations, as it still does today.

It's needed to be noted that repairs to the hydroelectric project are still ongoing. In contrast, the Kopili River's water level has surged over hazardous thresholds as a result of the state's recent heavy rains.

The district administration ran campaigns to warn individuals living along the river's banks to move to safer areas. The authorities also warned them to take safeguards.






FOLLOW US F
POPULAR
FEATURE
TRENDY
Missing Man's Body Recovered from Palla River: Murder Suspected over Extramarital Affair
The Future of Sri Lankan Cricket: Young Players, Emerging Stars, and the Next Generation of Talent
Man Detained for Attempting Illegal Second Marriage amid State Crackdown on Polygamy
From Floods to Farms: KADlien Promotes Potato Farming in Assam for Multinational Company, Empowering Flood-Affected Farmers for Economic Growth and Sustainability
Bijni: Mother of 6-Year-Old Missing for over Two Months
Shocking Daylight Murder: Missing Dhakuakhana Businessman Found Dead in Neighbour's Residence