--°C
Loading...
Listen to Article
2 min read
80%
On Friday, the NEEPCO opened six gates of the Khandong Dam at Umrangso in Assam's Dima Hasao...

Digital Desk: North Eastern Electric Power Corporation Limited (NEEPCO) opened up to six gates of the Khandong Dam at Umrangso in Assam's Dima Hasao.

According to sources, the decision to release the dam gates was made when the water levels in the Khargol and Kopili rivers exceeded the dam's capacity.

This comes amid torrential rains in Assam and the Northeast. Last year, an accident at NEEPCO's 75 Megawatt project halted all operations, as it still does today.

It's needed to be noted that repairs to the hydroelectric project are still ongoing. In contrast, the Kopili River's water level has surged over hazardous thresholds as a result of the state's recent heavy rains.

The district administration ran campaigns to warn individuals living along the river's banks to move to safer areas. The authorities also warned them to take safeguards.






FOLLOW US F
POPULAR
FEATURE
TRENDY
Swine flu (H1N1) Case Confirmed in Puranigudam: Patient Receiving Treatment at GMCH
Tension Grips Doomdooma after Man Allegedly Abducts Girl using False Identity
Two Armed Dacoits Apprehended by Rupahihat Police: Pistol and Ammunition Recovered
Assam Contractor Brutally Murdered in Chennai; Bangladeshi Woman and Two Accomplices Arrested
Dispur: Auto-Rickshaw Driver Arrested for Abduction and Attempted Rape
EU Signals Strong Investment Interest in Assam Following Blue Valley Cluster Launch